- Joined
- Aug 5, 2015
- Messages
- 4,336
Address: 109 West 38th St. off 6th Ave.
Fire in a bike shop on the first floor of a 12 story 40x70 class 1 commercial building
B-9: Fill out the box, we have a bike shop with a sprinkler head going off - L-24 is starting to cut the gates - 03:16
B-9: Transmit the 10-76 - Fire on the first floor - 03:20
L-2 FAST, E-54 CFR, E-3 w/ HR-1, E-8 Lobby, E-263 Communications, B-7 Safety
B-9: All Hands - Fire in a E-bike shop - 1 L/S/O - Assign the Hazmat response - 03:26
D-3: 2 L/S, 1 L/O - MBFKD, DWH - 03:40
D-3: AVFKD - 03:46
D-3: Special call 2 additional trucks (L-26 act. 24 & L-25 act. 4) - 03:48
D-3: PWH - 04:13
D-3: Under Control - 04:32
Duration: 1 Hour & 24 Min.
Maybe:
E-26, 34, 65, 1, 54C, 8L
L-24, 7, 2F, 12, 21, 26 (act. 24) s/c, 25 (act. 4) s/c
B-9, 8, 6, 10, 7S
R-1
SQ-18
D-3
FC, SB, RB, TSU-1, CTU, MSU
E-3 w/ HR-1
HM-1, HMB, E-44 HTU
E-263 Communications
RAC-3, RM
Car-23d
*Some companies initially unavailable
Relocations:
E-292 to E-1
E-35 to E-3
L-163 to L-7
L-25 to L-4
L-102 to L-4
L-26 to L-24
Fire in a bike shop on the first floor of a 12 story 40x70 class 1 commercial building
B-9: Fill out the box, we have a bike shop with a sprinkler head going off - L-24 is starting to cut the gates - 03:16
B-9: Transmit the 10-76 - Fire on the first floor - 03:20
L-2 FAST, E-54 CFR, E-3 w/ HR-1, E-8 Lobby, E-263 Communications, B-7 Safety
B-9: All Hands - Fire in a E-bike shop - 1 L/S/O - Assign the Hazmat response - 03:26
D-3: 2 L/S, 1 L/O - MBFKD, DWH - 03:40
D-3: AVFKD - 03:46
D-3: Special call 2 additional trucks (L-26 act. 24 & L-25 act. 4) - 03:48
D-3: PWH - 04:13
D-3: Under Control - 04:32
Duration: 1 Hour & 24 Min.
Maybe:
E-26, 34, 65, 1, 54C, 8L
L-24, 7, 2F, 12, 21, 26 (act. 24) s/c, 25 (act. 4) s/c
B-9, 8, 6, 10, 7S
R-1
SQ-18
D-3
FC, SB, RB, TSU-1, CTU, MSU
E-3 w/ HR-1
HM-1, HMB, E-44 HTU
E-263 Communications
RAC-3, RM
Car-23d
*Some companies initially unavailable
Relocations:
E-292 to E-1
E-35 to E-3
L-163 to L-7
L-102 to L-4
Last edited: