3/28/26 Manhattan 10-77 Box 1609

Joined
Aug 1, 2023
Messages
605
Location 644 riverside drive
Fire in a basement
12 Story MD 150 X 125
Rundown
E-80,69,37,84
E-39 w/ HR2
E-47 HRN
E-59 CFRD
L-23,28,40F
L-34,30,26
B-16,12,14
B-11 Safety
D-6
R-3
SQ41
SB,RB
M1
MB
FC
RM
 
Last edited:
Location 644 riverside drive
Fire in a basement
Rundown
E-80 E-69 E-37
L-28 L-40F
E-39 HRN
E-69 CFR-D
L-30 vent
Bn-16 10-77 Chief
Bn-11 bn-12 bn-14 safety
Rescue 3
SQ-41
Rescue bn
Safety bn
Marine 1
Marine bn
Field com
RAC manager
HRU-2
4th due engine? 1st due truck? Missing the trucks on the 10-77.

E39 transporting HR2, so wouldn’t have L30 vent. Don’t think 30 is a VSU anyway.
 
Location 644 riverside drive
Fire in a basement
Rundown
E-80 E-37 E-84 E-59
TL-23 L-28 L-40F
E-39 HRN
E-69 CFR-D
L-26 vent
Bn-16 10-77 Chief
Bn-11 bn-12 bn-14 safety
Rescue 3
SQ-41
Rescue bn
Safety bn
Marine 1
Marine bn
Field com
RAC manager
HRU-2
L26 is not Vent support either! See my post above…they were assigned extra truck per BC16 request for an extra truck. You posted first - understood. But please, for the sake of not having to keep editing the post incorrectly, leave it as is and wait for someone with the correct rundown or audio to supplement.
 
L26 is not Vent support either! See my post above…they were assigned extra truck per BC16 request for an extra truck. You posted first - understood. But please, for the sake of not having to keep editing the post incorrectly, leave it as is and wait for someone with the correct rundown or audio to supplement.
Agreed. No need to add erroneous information. Better to put question marks or some kind of placeholder & simply ask for help.
 
E-67 may be in the mix, possibly 4th due since 84 was requested as the extra engine. Everything else checks out.

Rundown should be:
E-80,69,37,??,84
E-39 w/ HR2
E-47 HRN
E-59 CFRD
L-23,28,40F
L-34,30,26
B-16,12,14
B-11 Safety
D-6
R-3
SQ41
SB,RB
M1
MB
FC
RM
 
B16: 10-77, fire in basement - extra E/T above All Hands for Window Bars

B16: (1) line being stretched, (1) room fire in basement

B16: UC (duration 27 min.)

L43 act. L28
B6 act. B12
E74 act. E37
L40 act. L55
E26 act. E80
 
Back
Top