- Joined
- Oct 17, 2013
- Messages
- 5,961
Address: 34-12 36 Street - between 34 & 35 Avenue
Fire on the 3rd floor and roof of a 3 story 600x200 movie studio.
0649 - Bn. 49 - Transmit the 10-75. We have fire on the roof. Units checking the top floor for extension.
TL-163 FAST - E-312 4th Engine
0655 - Bn. 49 - We have fire on the top floor and visible fire from the roof. 1 L/S, not in operation.
0659 - Bn. 49 - All Hands - There is no visible fire on the 3rd floor. 1 L/S to the 3rd floor. 1 L/S/O on the roof.
0704 - Bn. 49 - All fire on the roof has been knocked down. Primaries still in progress due to the large open space.
0716 - Div. 14 - Primaries are negative throughout. PWH - Duration 38 minutes.
0724 - Div. 14 - Under Control - Duration 47 minutes.
Maybe:
E-262, 263, 325, 312
L-116, 117, 163F
B-49, 45
S-288
R-4
D-14
RAC-4
Fire on the 3rd floor and roof of a 3 story 600x200 movie studio.
0649 - Bn. 49 - Transmit the 10-75. We have fire on the roof. Units checking the top floor for extension.
TL-163 FAST - E-312 4th Engine
0655 - Bn. 49 - We have fire on the top floor and visible fire from the roof. 1 L/S, not in operation.
0659 - Bn. 49 - All Hands - There is no visible fire on the 3rd floor. 1 L/S to the 3rd floor. 1 L/S/O on the roof.
0704 - Bn. 49 - All fire on the roof has been knocked down. Primaries still in progress due to the large open space.
0716 - Div. 14 - Primaries are negative throughout. PWH - Duration 38 minutes.
0724 - Div. 14 - Under Control - Duration 47 minutes.
Maybe:
E-262, 263, 325, 312
L-116, 117, 163F
B-49, 45
S-288
R-4
D-14
RAC-4