Address: 1022 Lexington Ave.
Fire in b'ldg. under construction
4 story 20'x120' Class 3 Rehab Mixed Occupancy
Box loaded up
Maybe,
E22, 23, 65, 44, 39
L16, 13, 25F
B10, 8
S18
R1
D3
RAC1
Some companies initially unavailable (Box 7400)
L13 gave 10-75
L25F
B10: fire on scaffolding extended to b'ldg.
B10: 2 L/S not in operation
D3: transmit full 2nd Alarm
Maybe,
2nd Alarm
E40, 8, 53, 54
L2, 35
B7 S
B11 FF
B12 RUL
E9 w/Sat. 1
FCU, SB, RB, CTU, TSU1, RM
D3: fire on scaffolding, extension to top floor & roof, 3 L/S - 2 L/O
D3: MBFKD
D3: AVFKD, 3 L/S/O - 1 to roof, 1 top floor, 1 scaffolding
FC: UC as per D3 (duration 56 min.)
B10: s/c Engine (E91) to await DOB arrival
S288 act. R1
B18 act. B12
L42 act. L2
E47 act. E40
E71 act. E22
E286 act. E8
E34 act. E74
L1 act. L35
E259 act. E54
E28 act. E44
B4 act. B8
Fire in b'ldg. under construction
4 story 20'x120' Class 3 Rehab Mixed Occupancy
Box loaded up
Maybe,
E22, 23, 65, 44, 39
L16, 13, 25F
B10, 8
S18
R1
D3
RAC1
Some companies initially unavailable (Box 7400)
L13 gave 10-75
L25F
B10: fire on scaffolding extended to b'ldg.
B10: 2 L/S not in operation
D3: transmit full 2nd Alarm
Maybe,
2nd Alarm
E40, 8, 53, 54
L2, 35
B7 S
B11 FF
B12 RUL
E9 w/Sat. 1
FCU, SB, RB, CTU, TSU1, RM
D3: fire on scaffolding, extension to top floor & roof, 3 L/S - 2 L/O
D3: MBFKD
D3: AVFKD, 3 L/S/O - 1 to roof, 1 top floor, 1 scaffolding
FC: UC as per D3 (duration 56 min.)
B10: s/c Engine (E91) to await DOB arrival
S288 act. R1
B18 act. B12
L42 act. L2
E47 act. E40
E71 act. E22
E286 act. E8
E34 act. E74
L1 act. L35
E259 act. E54
E28 act. E44
B4 act. B8
Last edited: