4/28/24 Manhattan 10-77 Box 872

Joined
Jan 20, 2014
Messages
17,016
Fire Location: 790 7th Ave

Smoke on the 16th floor of a 25 story hotel

E-54,23,8,40
E-65(H.R Nozzle)
E-26(C.F.R.D)
E-84 w/ PK-84s/c
L-4,2,35(Fast)
L-21,16,115(Vent)
L-40 Act. 4s/c
B-9,8,7,10(Safety)
R-1
Sq-18
D-3
Rac-1
RB,SB
FC
RM-1
Car-23D (Press Duty)
Car-12 (Chief of Safety & Inspectional Services Command)

B-9 All Hands. s/c a PK Unit

B-9 need a ReBreather Task Force. (1) Soc Ladder (1) BC (1) Squad & the ReBreather Unit

Rebreather Task Force
L-25(Soc Support)
B-2 Act. 9
Sq-288
Rebreather 1

D-3 s/c an additional truck

D-3 you can turn around ReBreather 1 & Sq-288

Sq-288 directed to cover Sq-18

Relief
E-262 Act. 8
L-26 Act. 4
L-154 Act. 2(Fast)
B-16 Act. 9



Relocations:
Squad 288 Act. Squad 18
Battalion 2 Act Battalion 9
Ladder 40 Act. Ladder 4
 
Last edited:
Joined
Mar 9, 2023
Messages
2,487
B9: Using 1&2 Investigating A Smoke Condition On The 16th Floor. @15:31

B9: We Will Hold With The Present Assignment For Right Now, Still Investigating A Light Smoke Condition. @15:41

B9: We Need An Emergency Response From ConEd, Having Problems With The Switchgear Room. @15:45

B9: Transmit The 10-77, Elevated CO Readings On Multiple Floors. Also Have Smoldering Electrical Cables In The Walls. @15:58

MD/B9: TL35 Is Designated Your FAST Truck & Medical Branch Resources Are Responding.

MD/B9: E65HRN (Off E23), E26CFRD, B10SO, TL115VSU.

CIDS: 25-Story 175x200 Class 1 Hotel, Sprinklered Throughout. Fire Panel In The Lobby, Backup Generator & Fire Pump In The Cellar. Cell Site On The Roof.

D3: Using All Hands, Size Up As Per CIDS. Still Trying To Locate The Fire, s/c (1) Purple K Unit (E84 w/ PK84). s/c The Rebreather Task Force (Rebreather 1/L25SOC Support/B2 act. B9/SQ288). @16:23

Exposures:
1: Street
2: Street
3: Similar Attached
4: Street

D3: s/c (1) Additional Truck (L40 act. L4). @16:34

FC: Primary Searches From The Roof Down To The 14th Floor Are Complete & Negative, Primary Searches In The Cellar & Sub-Cellar Are Complete & Negative. ConEd Is On Scene, DWH. @16:49

FC: CO Levels Are Dropping, Return The Rebreather Task Force. DWH. @16:54

FC: Secondary Searches From The Roof Down To The 14th Floor Are Complete & Negative, Secondary Searches In The Cellar & Sub-Cellar Are Complete & Negative. ConEd Is Working To Isolate The Burning Wires, PWH. @17:06

FC: Per CAR12, s/c (1) Additional Engine (E262 act. E8), (1) Additional Truck (L26 act. L4) & (1) Additional Battalion Chief (B16 act. B9). Also s/c (1) Additional FAST Truck (L154F act. L2) For Relief Purposes. @17:19

D3: Secondary Searches On Floors 1-12 Are Complete & Negative. @17:37

Relocations:
B49 act. B8
E7 act. E54
L40 act. L4
B2 act. B9

B40 act. B7
SQ288 act. SQ18
E262 act. E8
B16 act. B9

TL45 act. TL35
L26 act. L4
L154 act. L2

B26 act. B9
L28 act. L4
 
Last edited:
Top