- Joined
- Mar 9, 2023
- Messages
- 2,585
Incident Location: 110 Holly Street
E160: We Have A Fire In The Rear. Will Check And Advise.
B21: All Hands On Arrival, Fire In Rear Extending Into Private Dwelling. Smoke On 1st & 2nd Floor.
L85: FAST
D8: All Visible Fire Knocked Down. (Duration 15 Min)
D8: Primary Searches On 1st, 2nd Floor & Basement Complete & Negative. Trucks Opening Up. DWH. (Duration 20 Minutes)
D8: Special Call Additional Truck Company (L78)
D8: Secondary Searches In Basement & 2nd Floor Complete & Negative. Trucks Continuing To Open Up And Check For Extension. DWH. (Duration 28 Min)
D8: Primary & Secondary Searches Throughout Complete & Negative. Extensive Overhaul Being Conducted In Rear. PWH. (Duration 30 Minutes)
D8: UNDER CONTROL. D8 10-8, B21: IC/Point Of Contact.
Rundown:
E160,E159,E161,E152
L81,TL77,TL85F,L78 s/c
B21,B22
R5
SQ8
D8
RAC5
Engine 284 w/ Satellite 3
Relocations:
B31 Acting B21
L80 Acting L81
E280 Acting SQ8
L156 Acting
E160: We Have A Fire In The Rear. Will Check And Advise.
B21: All Hands On Arrival, Fire In Rear Extending Into Private Dwelling. Smoke On 1st & 2nd Floor.
L85: FAST
D8: All Visible Fire Knocked Down. (Duration 15 Min)
D8: Primary Searches On 1st, 2nd Floor & Basement Complete & Negative. Trucks Opening Up. DWH. (Duration 20 Minutes)
D8: Special Call Additional Truck Company (L78)
D8: Secondary Searches In Basement & 2nd Floor Complete & Negative. Trucks Continuing To Open Up And Check For Extension. DWH. (Duration 28 Min)
D8: Primary & Secondary Searches Throughout Complete & Negative. Extensive Overhaul Being Conducted In Rear. PWH. (Duration 30 Minutes)
D8: UNDER CONTROL. D8 10-8, B21: IC/Point Of Contact.
Rundown:
E160,E159,E161,E152
L81,TL77,TL85F,L78 s/c
B21,B22
R5
SQ8
D8
RAC5
Engine 284 w/ Satellite 3
Relocations:
B31 Acting B21
L80 Acting L81
E280 Acting SQ8
L156 Acting
Last edited: