5/21/2011 All Hands Manhattan Box 0655

Joined
Nov 27, 2007
Messages
1,905
Chelsea, Manhattan, NY, 5/21/11

Address: 516 West 27 st between 10th and 11th aves

07:08 hours
Phone Box 655 - Report of fire in the basement
Engs. 1, 34, 3
L24, TL21
Battalion 7
Rescue 1


10-75-655 - 7:15 hours
E26
TL12 (FAST Truck)
Battalion 9
Division 1
Squad 18


CIDS for 516 W27 st:
Hotel 9 story 50x60 class 1.  Lightweight construction for room partitions.  Hydrant in front of 519 w27 st.

07:16 hours
Battalion 7: 655 at this time give me an additional engine and truck, we're stretching approximately 8 lengths of hoseline and it's under construction at this time.
E14, L4 S/C

07:18 hours - Duration 12 minutes
Exposures are:
1 - street
2 - 2 story commercial
3 - unknown
4 - 4 story commercial/gallery

7-5-655 - 07:31 hours - Duration 24 minutes
Division 1: Box 655 we're using All-Hands, main body of fire is knocked down, searches are in progress, trucks are opening up.
RAC1

07:35 hours - Duration 28 minutes
DC1: Box 655, DC McPartland reports fire is Probably Will Hold.  All fire is knocked down, all companies are continuing to operate, trying to clear smoke out of the basement.

07:43 hours - Duration 35 minutes
DC1: Primary searches in the basement are complete and negative.  Secondary searches on the ground floor and all floors above are negative.  Final searches will be delayed, we're doing extensive overhaul in the basement.  Fire is still Probably Will Hold.

07:48 hours - Duration 41 minutes
DC1: Box 655, by orders of DC McPartland, secondaries in the basement are complete and negative, secondaries on the ground floor and all floors above are complete and negative.  Fire Under Control, units will continue to operate due to extensive overhaul.  Battalion 7 is Incident Commander, Division 1 is 10-8.

Relocations: E10/3, E15/14, L8/24
 
Top