Address: 48 W. 48 St.
Fire 9th floor, 16 story, 100'x95' Class 1 Office B'ldg.
Maybe,
E-54, 8, 34, 65
E-1 (C.F.R.D)
E-40 (Lobby)
E-7 (Comm)
E-3 w/ H.R 1
L-4 ,2, 7F
L- 21, 12, 8 act. 4 s/c, 24 s/c
B-9, 8, 7, 6,10(Safety)
R-1
Sq-18
D-3
Rac-1
RB, SB
FC
HM1, HMB, E44 HazMat Tech
Tac-1
RM-1
Mask
E65 became available & assigned after 10-76 was given
B9 gave 10-76 for fire on 9th floor of office b'ldg.
L7F
B9: 1 L/S/O
D3: need 2 add'l Trucks (L8 act. L4/L24)
D3: we removed (2) E-bikes from floor above, need response from HazMat
D3: UC - duration 51 min.
B45 act. B8
B17 act. B9
L8 act. L4
L117 act. L
L11 act. L4
E239 act. E3
E37 act. E54
L23 act. L21
L128 act. L24
L55 act. L2
Fire 9th floor, 16 story, 100'x95' Class 1 Office B'ldg.
Maybe,
E-54, 8, 34, 65
E-1 (C.F.R.D)
E-40 (Lobby)
E-7 (Comm)
E-3 w/ H.R 1
L-4 ,2, 7F
L- 21, 12, 8 act. 4 s/c, 24 s/c
B-9, 8, 7, 6,10(Safety)
R-1
Sq-18
D-3
Rac-1
RB, SB
FC
HM1, HMB, E44 HazMat Tech
Tac-1
RM-1
Mask
E65 became available & assigned after 10-76 was given
B9 gave 10-76 for fire on 9th floor of office b'ldg.
L7F
B9: 1 L/S/O
D3: need 2 add'l Trucks (L8 act. L4/L24)
D3: we removed (2) E-bikes from floor above, need response from HazMat
D3: UC - duration 51 min.
B45 act. B8
B17 act. B9
L117 act. L
L11 act. L4
E239 act. E3
E37 act. E54
L23 act. L21
L128 act. L24
L55 act. L2
Last edited: