- Joined
- Apr 13, 2012
- Messages
- 9,121
463 Stobe Avenue
Ruptured 2" high pressure gas main
E165 picking up their 2nd piece
HM1 and HM BC continuing in until the leak is stopped
BC21 using AH/UC
Probably:
E157/159, E165, E161
T085, L081
BC. 21
HM, HMB
E165 2nd piece
*E157 acting 159 first due*
Ruptured 2" high pressure gas main
E165 picking up their 2nd piece
HM1 and HM BC continuing in until the leak is stopped
BC21 using AH/UC
Probably:
E157/159, E165, E161
T085, L081
BC. 21
HM, HMB
E165 2nd piece
*E157 acting 159 first due*
Last edited: