Address: 62 Greenwich Avenue - between West 10 & West 11 Street
Fire on the 3rd floor and cockloft of a 3 story 25x50 brownstone.
0858 - Bn. 7 - Transmit the 10-75. Fire in a 3 story brownstone.
L-3 FAST
0901 - Bn. 7 - Using All Hands - Fire on the top floor and in the cockloft. 1 L/S/O, primaries are in progress, trucks opening up.
0912 - Div. 1 - 2 L/S, 1 L/O, MBFKD. Primaries are negative on the top floor. Trucks continue to open up. DWH
0920 - Div. 1 - Primaries are complete and negative throughout. Trucks are still opening up. DWH
0927 - Div. 1 - We found fire in the roof beams. Trucks are opening up to access the beams. Primaries are negative in exposures 2 & 4.
0931 - Div. 1 - Secondaries are negative throughout. Companies will continue to overhaul. PWH - Duration 45 minutes.
0942 - Div. 1 - Under Control - Duration 57 minutes.
Maybe:
E-S18, 3, 24, 14
L-12, 5, 3F
B-7, 2
S-1
R-1
D-1
RAC-1
Relocators:
E-40 act. E-3
E-26 act. E-24
TL-1 act. TL-12
Fire on the 3rd floor and cockloft of a 3 story 25x50 brownstone.
0858 - Bn. 7 - Transmit the 10-75. Fire in a 3 story brownstone.
L-3 FAST
0901 - Bn. 7 - Using All Hands - Fire on the top floor and in the cockloft. 1 L/S/O, primaries are in progress, trucks opening up.
0912 - Div. 1 - 2 L/S, 1 L/O, MBFKD. Primaries are negative on the top floor. Trucks continue to open up. DWH
0920 - Div. 1 - Primaries are complete and negative throughout. Trucks are still opening up. DWH
0927 - Div. 1 - We found fire in the roof beams. Trucks are opening up to access the beams. Primaries are negative in exposures 2 & 4.
0931 - Div. 1 - Secondaries are negative throughout. Companies will continue to overhaul. PWH - Duration 45 minutes.
0942 - Div. 1 - Under Control - Duration 57 minutes.