- Joined
- Apr 13, 2012
- Messages
- 9,383
3:00AM
8 Holly Avenue off Sycamore Street
Heavy Fire in the basement, 1st floor, 2nd floor and through the roof of a private dwelling
3rd alarm transmitted
Div. 8 to SI: We pulled all units out of the building, we need Con-Ed for power lines. Exterior operations.
Div. 8 to SI: 5L/S/O. Roll call conducted, all members are accounted for. Moving to TL operations.
BC39 to SI: We are 10-84 at Floyd Bennet Field @03:40hrs
Div. 8 to SI: We need National Grid forthwith, we have a gas-fed Fire in the rear. Tower Ladder (85) is knocking the fire down at the roof.
National Grid ETA: 20 mins
Con-Ed ETA: 20 mins
Car 4C to Richmond: We’re 10-84
Car 22C: Responding to your 3rd alarm.
E246Communications to SI: 10-84 at your 3rd alarm
Div. 8 to SI: Box 3828, S/C (2) trucks please (L081, L109/L82). Have them come to the staging area. Best access is from Armstrong Avenue up from Hylan Blvd.
Div. 8 to SI: Box 3828, fire extinguished in the basement. Companies are moving in to extinguish all pockets of fire @4:04hrs - 1 hr 3 mins duration.
BC39 to SI: 10-84 over the job site, switching over to the command channel @04:07hrs.
From Fireground DARS:
-Start the secondaries. We have the occupants accounted for, they're with PD around the corner.
-BC to 83 Truck: Bring some shovels to the top floor, alot of overhaul.
-Rescue we're gonna get another truck up on the top floor.
-Command to RB: Put a line into 2nd floor.
-TL85 Bucket hitting pockets of fire in the center of the building.
-Small amount of blue flames in the rear, keeping an eye on it.
-We have fire above us. Sending RS-5 down when another truck comes up.
-Secondaries gonna be delayed due to clutter.
-No visible fire in basement and 1st floor. Secondaries are in progress in basement and 1st floor.
-Fire sector to TL86: Progress on secondaries?
-TL86: Gonna be delayed.
-BC22: Gonna send E156 to relieve E165 in the rear.
-L83 to units out front: Watch out, we're gonna start to throw stuff out the window here.
-Secondaries are negative, we did a good search.
-E157 Nozzle, slowly back out with the line.
-No sign of fire in the top corner that is leaning out.
-Command to TL86: That front room that leads outside, let me know.
-TL76 is almost done opening up, then we'll have E161 wash it down.
E-162/L-82/BC-23 First Due
Relocations:
E228/E159
TL131/TL85
L109/L82
BC33/BC23
BC43/BC22
E280/E153
L113/TL86
E157/E??
E152/E151
TL172/TL77
E318/E168
L166/L084
BC58/BC21
E321/E??
E202/E156
E211/E161
E240/E158
*E318/L166 housed together, both relocated to companies on SI where they still run in 1st due together (E168 and L84) - just interesting*
8 Holly Avenue off Sycamore Street
Heavy Fire in the basement, 1st floor, 2nd floor and through the roof of a private dwelling
3rd alarm transmitted
Div. 8 to SI: We pulled all units out of the building, we need Con-Ed for power lines. Exterior operations.
Div. 8 to SI: 5L/S/O. Roll call conducted, all members are accounted for. Moving to TL operations.
BC39 to SI: We are 10-84 at Floyd Bennet Field @03:40hrs
Div. 8 to SI: We need National Grid forthwith, we have a gas-fed Fire in the rear. Tower Ladder (85) is knocking the fire down at the roof.
National Grid ETA: 20 mins
Con-Ed ETA: 20 mins
Car 4C to Richmond: We’re 10-84
Car 22C: Responding to your 3rd alarm.
E246Communications to SI: 10-84 at your 3rd alarm
Div. 8 to SI: Box 3828, S/C (2) trucks please (L081, L109/L82). Have them come to the staging area. Best access is from Armstrong Avenue up from Hylan Blvd.
Div. 8 to SI: Box 3828, fire extinguished in the basement. Companies are moving in to extinguish all pockets of fire @4:04hrs - 1 hr 3 mins duration.
BC39 to SI: 10-84 over the job site, switching over to the command channel @04:07hrs.
From Fireground DARS:
-Start the secondaries. We have the occupants accounted for, they're with PD around the corner.
-BC to 83 Truck: Bring some shovels to the top floor, alot of overhaul.
-Rescue we're gonna get another truck up on the top floor.
-Command to RB: Put a line into 2nd floor.
-TL85 Bucket hitting pockets of fire in the center of the building.
-Small amount of blue flames in the rear, keeping an eye on it.
-We have fire above us. Sending RS-5 down when another truck comes up.
-Secondaries gonna be delayed due to clutter.
-No visible fire in basement and 1st floor. Secondaries are in progress in basement and 1st floor.
-Fire sector to TL86: Progress on secondaries?
-TL86: Gonna be delayed.
-BC22: Gonna send E156 to relieve E165 in the rear.
-L83 to units out front: Watch out, we're gonna start to throw stuff out the window here.
-Secondaries are negative, we did a good search.
-E157 Nozzle, slowly back out with the line.
-No sign of fire in the top corner that is leaning out.
-Command to TL86: That front room that leads outside, let me know.
-TL76 is almost done opening up, then we'll have E161 wash it down.
E-162/L-82/BC-23 First Due
Relocations:
E228/E159
TL131/TL85
L109/L82
BC33/BC23
BC43/BC22
E280/E153
L113/TL86
E157/E??
E152/E151
TL172/TL77
E318/E168
L166/L084
BC58/BC21
E321/E??
E202/E156
E211/E161
E240/E158
*E318/L166 housed together, both relocated to companies on SI where they still run in 1st due together (E168 and L84) - just interesting*
Last edited: