- Joined
- Aug 5, 2015
- Messages
- 4,261
Address: 69-15 Astoria Blvd North off Hazen St.
Fire at a 1½ story 35x40 class 2 metal shop
Phone Alarm Box 3277 - Reporting fire in a scrap yard at Astoria Blvd. & Hazen St. - 18:27
E-312: We're approaching, you can fill out the box - Heavy black smoke - 18:27
Box loaded up due to numerous calls - 18:29
E-312: Urgent 10-75 - Fire in a 1 story taxpayer - 18:28
TL-163 FAST
B-49: All Hands on arrival - Give us a TL on the extra 1&1 (TL-138) - 18:31
B-49: Fire in a 1 story scrap metal yard - 2 L/S, 1 L/O - Corrected address is 69-15 Astoria Blvd North - 18:33
Box number changed to 7653
B-49: 2 L/S/O, in the process of setting up TL-117 - 18:38
D-14: Fire is on the exterior of the structure - 2 L/S/O - TL-117 is setup & operating - 18:45
D-14: Conditions remain unchanged - In the process of setting up a 2nd TL - Releasing the Rescue & Squad - 18:54
D-14: Special call 1 truck to relieve the FAST truck (TL-135 act. 163) - 19:36
D-14: Continuing to overhaul the pile, shutting down TL's, operating with 2 handlines - 19:52
D-14: PWH - 20:18
D-14: Under Control - 20:40
Duration: 2 Hours & 15 Min.
Maybe:
E-263, 312, 307, 316, 262
L-117, 154, 163F, 138, 135F (act. 163) s/c
B-49, 46
R-4
SQ-288
D-14
RAC-3
CTU
Relocations:
E-297 to E-312
E-53 to E-262
E-294 to E-307
L-135 to L-163
L-167 to L-154
Fire at a 1½ story 35x40 class 2 metal shop
Phone Alarm Box 3277 - Reporting fire in a scrap yard at Astoria Blvd. & Hazen St. - 18:27
E-312: We're approaching, you can fill out the box - Heavy black smoke - 18:27
Box loaded up due to numerous calls - 18:29
E-312: Urgent 10-75 - Fire in a 1 story taxpayer - 18:28
TL-163 FAST
B-49: All Hands on arrival - Give us a TL on the extra 1&1 (TL-138) - 18:31
B-49: Fire in a 1 story scrap metal yard - 2 L/S, 1 L/O - Corrected address is 69-15 Astoria Blvd North - 18:33
Box number changed to 7653
B-49: 2 L/S/O, in the process of setting up TL-117 - 18:38
D-14: Fire is on the exterior of the structure - 2 L/S/O - TL-117 is setup & operating - 18:45
D-14: Conditions remain unchanged - In the process of setting up a 2nd TL - Releasing the Rescue & Squad - 18:54
D-14: Special call 1 truck to relieve the FAST truck (TL-135 act. 163) - 19:36
D-14: Continuing to overhaul the pile, shutting down TL's, operating with 2 handlines - 19:52
D-14: PWH - 20:18
D-14: Under Control - 20:40
Duration: 2 Hours & 15 Min.
Maybe:
E-263, 312, 307, 316, 262
L-117, 154, 163F, 138, 135F (act. 163) s/c
B-49, 46
R-4
SQ-288
D-14
RAC-3
CTU
Relocations:
E-297 to E-312
E-53 to E-262
E-294 to E-307
L-167 to L-154
Last edited: