- Joined
- Oct 17, 2013
- Messages
- 5,962
Address: 203 East 13 Street at 3 Avenue
Fire in the roof penthouse of a 4 story 20x100 MD.
1542 - Bn. 6 - "Urgent" - 10-75 - We have fire on the roof.
H&L-20 FAST - E-16 4th Engine
1543 - Bn. 6 - We have fire through the roof of the penthouse in a MD.
1546 - Bn. 6 - All Hands - Extra Engine and Truck (E-3, TL-12).
1553 - Div. 1 - 2 L/S, 1 L/O, water on the fire, primaries are negative on the top floor, searches underway in the penthouse. There was a partial collapse of the penthouse.
1600 - Div. 1 - Fire is darkening down.
1610 - Div. 1 - Primaries and secondaries are complete and negative in all but the elevator machine room. The fire was located in the machine room. DWH
1623 - Div. 1 - Awaiting the searches in the elevator machine room. Units continuing to overhaul. PWH - Duration 41 minutes.
1633 - Div. 1 - Secondaries are negative. Under Control - Duration 51 minutes.
Maybe:
E-5, 14, 33, 16, 3 s/c
L-3, 9, 20F, 12 s/c
B-6, 7
S-18
R-1
D-1
RAC-1
Fire in the roof penthouse of a 4 story 20x100 MD.
1542 - Bn. 6 - "Urgent" - 10-75 - We have fire on the roof.
H&L-20 FAST - E-16 4th Engine
1543 - Bn. 6 - We have fire through the roof of the penthouse in a MD.
1546 - Bn. 6 - All Hands - Extra Engine and Truck (E-3, TL-12).
1553 - Div. 1 - 2 L/S, 1 L/O, water on the fire, primaries are negative on the top floor, searches underway in the penthouse. There was a partial collapse of the penthouse.
1600 - Div. 1 - Fire is darkening down.
1610 - Div. 1 - Primaries and secondaries are complete and negative in all but the elevator machine room. The fire was located in the machine room. DWH
1623 - Div. 1 - Awaiting the searches in the elevator machine room. Units continuing to overhaul. PWH - Duration 41 minutes.
1633 - Div. 1 - Secondaries are negative. Under Control - Duration 51 minutes.
Maybe:
E-5, 14, 33, 16, 3 s/c
L-3, 9, 20F, 12 s/c
B-6, 7
S-18
R-1
D-1
RAC-1