- Joined
- Jan 20, 2014
- Messages
- 17,147
Fire Location: 4064 Barnes Ave
Bronx Phone Alarm Box 3805. 4064 Barnes Ave. East 228 St to East 229 St. Reported as a Private Dwelling Fire
XCO to E-63 "Its going to be work"
B-15 its going pretty good we got a header in the distance
Reports of people trapped. Box Loaded Up E-66 4th Due R-3 Sq-61
E-63 gave the 10-75
Fire in a Private Dwelling
XCO to B-15 L-32 is your fast truck
E-63,38,62,66,97s/c
L-39,51,32(Fast),61s/c,37s/c,59s/c,58 Act. 51s/c,41s/c
B-15,27
R-3
Sq-61
D-7
Rac-3
HM-1
HMB
E-274 w/ 2nd Piece
Haz-Mat Ops Pick Up
B-15 we have fire on the 1st & 2nd floors of a 3 story PD 150 X 40. 1 L/S/O. Stretching a 2nd Line. Water on the fire @10:49
D-7 10-84
D-7 Extra Truck & Engine@10:55
XCO Transmit the All Hands @10:55
Exposures:
1. Street
2. Similar Detached
3. Yard
4. Similar Detached
D-7 we have (3) 10-45s No Codes. Start out Haz-Mat for E-Bikes @10:56
L-58 Act. L-51 10-8 in their area @10:57
Squad 288 Relocating to Squad 41
D-7 2 L/S/O. Primary on 2nd & 3rd floor complete & negative, Secondary's still in progress @ 11:04
D-7 Special Call (2) additional Trucks @11:08
B-26 10-8 in B-15's Area
E-46 is 10-8 in E-97's Area
D-7 going to make this a 10-41 Code 1
L-40 on your frequency relocating to L-37
D-7 secondary searches complete and negative. Total or (4) 10-45s (2) Code 3s & (2) Code 4s @11:30
D-7 Special Call (2) additional Trucks @11:31
D-7 have Con-Ed Gas & Electric Respond. Both Utilities have been compromised due to the fire @ 11:36
L-117 Act. L-41 on your frequency
L-44 10-8 in L-51's Area
D-7 PWH. Additional Engine for Relief @ 12:05
Relief Engine @ 12:05
E-73
D-7 Mixer Off Message @ 12:15
B-15 Under Control @12:56
Relocations:
Squad 288 Relocated to Squad41
Engine 96 Act. Engine 63
Engine 46 Act. Engine 97
Engine 48 Act. Engine 66
Engine 68 Act. Engine 62
Ladder 117 Act. Ladder 41
Ladder 34 Act. Ladder 39
Ladder 40 Act. Ladder 37
Ladder 58 Act. Ladder 51
Ladder 44 Act. Ladder 51
Battalion 26 Act. Battalion 15
Bronx Phone Alarm Box 3805. 4064 Barnes Ave. East 228 St to East 229 St. Reported as a Private Dwelling Fire
XCO to E-63 "Its going to be work"
B-15 its going pretty good we got a header in the distance
Reports of people trapped. Box Loaded Up E-66 4th Due R-3 Sq-61
E-63 gave the 10-75
Fire in a Private Dwelling
XCO to B-15 L-32 is your fast truck
E-63,38,62,66,97s/c
L-39,51,32(Fast),61s/c,37s/c,59s/c,58 Act. 51s/c,41s/c
B-15,27
R-3
Sq-61
D-7
Rac-3
HM-1
HMB
E-274 w/ 2nd Piece
Haz-Mat Ops Pick Up
B-15 we have fire on the 1st & 2nd floors of a 3 story PD 150 X 40. 1 L/S/O. Stretching a 2nd Line. Water on the fire @10:49
D-7 10-84
D-7 Extra Truck & Engine@10:55
XCO Transmit the All Hands @10:55
Exposures:
1. Street
2. Similar Detached
3. Yard
4. Similar Detached
D-7 we have (3) 10-45s No Codes. Start out Haz-Mat for E-Bikes @10:56
L-58 Act. L-51 10-8 in their area @10:57
Squad 288 Relocating to Squad 41
D-7 2 L/S/O. Primary on 2nd & 3rd floor complete & negative, Secondary's still in progress @ 11:04
D-7 Special Call (2) additional Trucks @11:08
B-26 10-8 in B-15's Area
E-46 is 10-8 in E-97's Area
D-7 going to make this a 10-41 Code 1
L-40 on your frequency relocating to L-37
D-7 secondary searches complete and negative. Total or (4) 10-45s (2) Code 3s & (2) Code 4s @11:30
D-7 Special Call (2) additional Trucks @11:31
D-7 have Con-Ed Gas & Electric Respond. Both Utilities have been compromised due to the fire @ 11:36
L-117 Act. L-41 on your frequency
L-44 10-8 in L-51's Area
D-7 PWH. Additional Engine for Relief @ 12:05
Relief Engine @ 12:05
E-73
D-7 Mixer Off Message @ 12:15
B-15 Under Control @12:56
Relocations:
Squad 288 Relocated to Squad41
Engine 96 Act. Engine 63
Engine 46 Act. Engine 97
Engine 48 Act. Engine 66
Engine 68 Act. Engine 62
Ladder 117 Act. Ladder 41
Ladder 34 Act. Ladder 39
Ladder 40 Act. Ladder 37
Ladder 44 Act. Ladder 51
Battalion 26 Act. Battalion 15
Last edited: