9/7/2024 Bronx All Hands 10-77 Box 3039

Joined
Oct 17, 2013
Messages
5,951
Address: 1690 East 174 Street - between Fteley and Croes Avenue

Fire on the 6th floor of a 12 story 150x75 MD.

1749 - Bn. 18 - Using 2x2 for a rubbish fire in Apt. 6A. One line stretched, not in operation.

1751 - Bn. 18 - Transmit the 10-77. Fire in Apt. 6A. Trucks are opening up, one line being stretched. DWH

TL-41 FAST

1753 - Bn. 18 - Primaries are complete and negative in the fire apartment.

1757 - Bn. 18 - PWH - Duration 20 minutes.

1801 - Bn. 18 - Secondaries are still underway. Make this a 10-41 code 1, there was fire in two different locations.

1806 - Bn. 18 - Secondaries are negative in the hallways and fire apartment. Under Control - Duration 28 minutes.

1830 - Bn. 18 - We used All Hands. FD operations are concluded.

Maybe:
E-96, 45, 90, 82, 88 HRN, 73 CFRD
L-54, 58, 41F, 31, 48, 17 VSU
B-18, 3, 20, 26 Safety
S-61
R-3
D-6
RB, SB, FC
RAC-3, RM

Relocators:
E-35 act. E-82
E-43 act. E-45
E-306 act. E-96
TL-44 act. TL-58
B-53 act. B-18
 
Last edited:
Top