7 Squad 2nd Pieces? I think the numbers are wrongHmmmm , 9 new rescue rigs ….7 new collapse rigs , non of it makes any sense.
SQ18 fit a HMTU inside there house before, and I want to say SQ252 had the spare before and that’s longerIs the bid for new collapse rescue rigs or squad’s second pieces ? The original post said collapse rigs . And if the bid is actually for squad second pieces ….i got ask ..where is Sq 1, 18 ,& 252 going to keep them ….because 4 door crew cabs won’t fit in their firehouses.
They would give them a tent to put it in.252 has put the second piece in the lot before so if this new one is to big they can just keep it outside
Did I miss the 7?I have attached the specs for the Collapse Rescue. The date for bid got change to march instead of February.
Page 7Did I miss the 7?
probably so all rescue have the same boat and motor for callsAfter reading the specs i am kinda lost, specs call for a space for a boat motor on a collapse rig???