141 Archer Ave
Fire top floor in a 3 story frame
19:50: Reported structure fire, multiple calls
19:55: E-6 - 10-26 (working fire), fire 3rd floor
19:59: Pelham E-5, Eastchester TL-17 relocate to Mt. Vernon station 3
20:04: E-5 FAST
20:17: Eastchester TL-17 to the scene, Pelham TL-3 to backfill cover at Mt. Vernon station 3
20:22: B-3 - Going to exterior ops, all members accounted for
20:52: B-3 - 1 ladder pipe operating on the 1/2 corner, using All Hands
21:18: B-3 - Still exterior ops, 1 ladder pipe & multiple hand lines in operation
21:56: B-3 - Now have 2 ladder pipes, multiple hand lines in operation
22:22: B-3 - Fire is U/C
22:58: B-3 - Overhauling, 1 line in operation hitting hot spots
Maybe:
E-6,4,3,5 FAST
L-2,1
B-3,
Fire top floor in a 3 story frame
19:50: Reported structure fire, multiple calls
19:55: E-6 - 10-26 (working fire), fire 3rd floor
19:59: Pelham E-5, Eastchester TL-17 relocate to Mt. Vernon station 3
20:04: E-5 FAST
20:17: Eastchester TL-17 to the scene, Pelham TL-3 to backfill cover at Mt. Vernon station 3
20:22: B-3 - Going to exterior ops, all members accounted for
20:52: B-3 - 1 ladder pipe operating on the 1/2 corner, using All Hands
21:18: B-3 - Still exterior ops, 1 ladder pipe & multiple hand lines in operation
21:56: B-3 - Now have 2 ladder pipes, multiple hand lines in operation
22:22: B-3 - Fire is U/C
22:58: B-3 - Overhauling, 1 line in operation hitting hot spots
Maybe:
E-6,4,3,5 FAST
L-2,1
B-3,