San Francisco, CA- 3rd Alarm 4/24/13

Date: 04-24-13
Time: 1050hrs Pacific
Box: 3442
Location: 2008 Vallejo X Laguna/Buchanan (Pacific Heights)
First Due: FS 38, FS 16
Description: Fire top floor and through the roof of a 3-story OMD.

1050hrs- Reports of smoke in a building.
1st Alarm: E-38, 16, 41; T-16, T-5; B-4, B-1;Div. 3; R-1; Medic 78

1055hrs- B-4 transmitting working fire, smoke showing top floor of a 3-story OMD. T-16 rpts smoke top floor, trying to locate fire.
Working Fire Dispatch: E-5, RC-1

1057hrs- B-4 transmitting 2nd Alarm.
2nd Alarm: E-2, 3, 10, 28; T-2; B-7; Mobile Air 1; Medic 9

1059hrs- CMD rpts water on the fire.

1101hrs- Div. 3 on location and IC. Command Post opp. front of building. B-4 is Fire Attack.

1106hrs- Co's rpt fire through the roof in rear. E-16, 38; T-5 on Fire Attack. E-16 running low on air.

1107hrs- Div. 3 transmitting 3rd Alarm. Fire running the attic and cockloft, complete involvement.
3rd Alarm: E-51, 36; T-3 (incomplete)

1109hrs- E-2 to take a line between fire building and Exposure D. (2) L/S/O on top floor.

1126hrs- Co's still have pockets of fire, continue to open up.

1132hrs- Co's clearing front of building due to instability of the parapet. Extensive overhaul.
 
Awesome rundown, truck4!

Any idea why the assignment was incomplete on the 3rd Alarm? Usually it's 4 & 2, BC.
 
Back