Yonkers, NY- 3rd Alarm 12-12-23

truck4

Administrator
Joined
Mar 1, 2007
Messages
2,766
Date: 12-12-23
Time: 0304hrs
Location: 20 Buckingham Road X Lockwood Ave
Description: Fire throughout a 3-story church hall.

0304hrs- Multiple calls for outside smoke area of Lockwood X Jessamine. State PD now have a caller stating fire in her home. (E-312 originally toned out for outside smoke, quickly upgraded)
E-312, 310, 306, Squad 11, L-75, 72, R-1, B-2

0308hrs- B-2 transmitting 10-29, 10-30, 2nd Alarm on arrival. Building is corner of Fowler X Buckingham.
All-Hands: E-309, L70FAST, B-1
2nd Alarm: E-307, 314, L-71

0310hrs- Heavy fire throughout top floor of a 3-story ordinary church hall with exposure to a 1.5-story church.

0312hrs- B-2 transmitting 3rd Alarm
3rd Alarm: E-308, 303, L-73

0315hrs- M/A E-22, L-12 New Rochelle to Station 12.

0318hrs- B-2 rpts structure is fully involved, Exposure 1- Street, 2-Street, 3-Side yard, 4-Courtyard. Req. L-71 to enter Lockwood to Buckingham.

0322hrs- WC B-14 responding.

0327hrs- B-2 rpts ACW, still heavy fire.

0332hrs- Car 4 req. L-73 to enter from Marlborough to set up on 2/3 side. Req. Water Dept to increase pressure.

0335hrs- B-2 rpts all members out of the building, exterior attack ATT.

0339hrs- B-2 rpts roof has collapsed.

0352hrs- Redirecting New Rochelle to Station 7 (construction at Station 12). M/A Greenville Squad 15 to Station 10.

0356hrs- B-2 rpts multiple master streams in operation. Roof has collapsed, partial wall collapse of top floor on exposure 2 side.

0420hrs- B-2 rpts (7) master streams in operation.

0446hrs- B-2 rpts fire darkening down






 
Last edited:
Back
Top