12 Ashbutron Place
2 Story attached building
12:43 hrs: 2 story, fire in exposure. 2nd Alarm. Car 4 responding in place of Car 2. Water Supply issues. 2nd Alarm to concentrate in Water Supply.
12:45 hrs: 2nd Alarm units to Stage at Ashburton x North Broadway. Police Supervisor also requested to that location. Police Supervisor requested ASAP
2nd Alarm Units: E310, 304; Sq 11; L74; Car 4.
2 three story attached residential structures, roofing opening, three lines stretched. Primary search in progress
12:47 hrs: Car 4 assuming Command. Battalion 1 Interior Sector Chief. Battalion 2 Staging Chief. There are 3, 2-story, wood-frame, occupied residential attached buildings. Fire appeared to have started in center fire building on 2nd floor, now fire into cockloft. Heavy smoke condition in other building. Companies opening roof, primaries in progress. 3 L/S/O.
12:50 hrs: Car 4 requesting L-74 walk in with tools to Command Post since they won't be able to ladder building.
12:50 hrs: *3rd Alarm*
3rd Alarm Units: Engines 307, 313; L-70.
12:58 hrs: E-22, TL-11 relocate to YFD Station #1. Greenville Engine, L-15 to Station #12.
13:00 hrs: Progress report by Car 4: Main fire building is still 12 Ashburton Pl. Fire in cockloft of both exposures. Exposures- #1 is Street, #2 2-story, wood-frame attached, #3 rear yard, #4 2-story attached. Companies making holes in roof. Primaries still underway. 3rd Alarm companies will be put to work once they arrive.
13:07 hrs: Car 4 requesting ETA on YFD Mask Service Unit (MSU), who is en-route. Requesting they come up Warburton Ave.
13:10 hrs: Car 4 Progress report- 6 L/S/O, holes in roof and more being made. Heavy fire in cockloft of main fire building and of exposures #2 and #4
13:19 hrs: Main body of fire K/D, companies overhauling.
2 Story attached building
12:43 hrs: 2 story, fire in exposure. 2nd Alarm. Car 4 responding in place of Car 2. Water Supply issues. 2nd Alarm to concentrate in Water Supply.
12:45 hrs: 2nd Alarm units to Stage at Ashburton x North Broadway. Police Supervisor also requested to that location. Police Supervisor requested ASAP
2nd Alarm Units: E310, 304; Sq 11; L74; Car 4.
2 three story attached residential structures, roofing opening, three lines stretched. Primary search in progress
12:47 hrs: Car 4 assuming Command. Battalion 1 Interior Sector Chief. Battalion 2 Staging Chief. There are 3, 2-story, wood-frame, occupied residential attached buildings. Fire appeared to have started in center fire building on 2nd floor, now fire into cockloft. Heavy smoke condition in other building. Companies opening roof, primaries in progress. 3 L/S/O.
12:50 hrs: Car 4 requesting L-74 walk in with tools to Command Post since they won't be able to ladder building.
12:50 hrs: *3rd Alarm*
3rd Alarm Units: Engines 307, 313; L-70.
12:58 hrs: E-22, TL-11 relocate to YFD Station #1. Greenville Engine, L-15 to Station #12.
13:00 hrs: Progress report by Car 4: Main fire building is still 12 Ashburton Pl. Fire in cockloft of both exposures. Exposures- #1 is Street, #2 2-story, wood-frame attached, #3 rear yard, #4 2-story attached. Companies making holes in roof. Primaries still underway. 3rd Alarm companies will be put to work once they arrive.
13:07 hrs: Car 4 requesting ETA on YFD Mask Service Unit (MSU), who is en-route. Requesting they come up Warburton Ave.
13:10 hrs: Car 4 Progress report- 6 L/S/O, holes in roof and more being made. Heavy fire in cockloft of main fire building and of exposures #2 and #4
13:19 hrs: Main body of fire K/D, companies overhauling.