Anyone have an update on the status of '79/37s quarters rebuild?2nd due for 79/37
Minimum a year I heard. Probably longerAnyone have an update on the status of '79/37s quarters rebuild?
Thanks Skyler. So it's a rebuild and not a teardown? That house was totally refurbished just a few years ago. The building is almost 125 years old. Historic to the neighborhood.Minimum a year I heard. Probably longer
I’ll take 2 years on da overMinimum a year I heard. Probably longer
What would a Verizon location be?Still looking to get temporary quarters for them, Lehman College shot down plans, a possible location is a Verizon location but power issues need to be addressed.
2885 Jerome Ave stretches from Bedford Park Blvd to just south of Minerva PlIf I remember correctly, Verizon had a yard on the west side of Jerome Ave near 198-199 streets. It has been a lot of years since I have been in that area so things may have changed.
On the truck side, L38 should see a big jump in their runs. They will now go 2d due into a large part of Bedford Park.Quite possible for 48 to hit nearly 10,000 runs this year. Should be interesting to see the numbers, especially considering 79 does 7,000 runs.
Wow how quickly we forget these things. Yes that’s right….. L038 had some long runs as second due up that way. And the runs and worker volume back then wasn’t even close to what it is today. Good observation!On the truck side, L38 should see a big jump in their runs. They will now go 2d due into a large part of Bedford Park.
Before L56 moved up from Monroe Avenue, L38 was second due all the way to Mosholu Parkway. I guess you could say 38 is just temporarily reclaiming their old territory.