- Joined
- Aug 5, 2015
- Messages
- 4,314
Address: 241 West 108th St. off Broadway
Fire on the 4th floor of a 8 story 75x85 class 2 MD
Phone Alarm Box 1323 - Reporting a fire at the construction site - 21:00
MD to B-11: Receiving a bunch of calls, some are reporting a fire at the construction site, manhole fire or a propane tank explosion - We're loading up your box & we're also giving you the Hazmat response due to the potential of a propane explosion - 21:01
B-11: We have a small electrical fire with some extension - Return all special units - Have Con Ed respond - 21:05
B-11: Using 2&2 for an electrical fire - 21:13
B-11: 1 L/S - Checking the building for CO levels - 21:35
B-11: We're still awaiting Con Ed - It seems the problem is extending into 241 & 235 we have flickering lights there - 21:55
B-11: Transmit a 10-75 - We have extension into apt. 4A at 241 West 108th St. - 22:12
L-26 FAST
B-11: Extra E&T (E-91 & TL-23) - 22:14
B-11: All Hands - 2 L/S, 1 L/O - DWH - 22:16
D-3: Based on the height of the building, Transmit a 10-77 - 22:20
E-74 HRN, E-80 CFR, B-10 Safety, E-39 w/ HR-2
D-3: Have Con Ed respond forthwith - 22:22
D-3: Transmit a 2nd Alarm - We have extension on the A line up to the 8th floor - 22:43
B-14 RUL, B-33 Air Recon, E-263 Comm. E-9 w/ Sat. 1
FC: Per D-3, We had a manhole fire with extension into Apt. 4A - Opening up all A line apartments, there's no extension - DWH - 23:03
FC: Con Ed is in the process of isolating power - 1 L/S to 241 West 108 & 1 L/S into 255 - DWH - 23:14
FC: Per C-4c, PWH - 23:39
FC: Under Control - 23:55
Duration: 2 hours & 58 min.
Maybe:
E-47, 76, 37, 58, 91 s/c, 74N, 80C
L-22, 40, 26F, 23 s/c, 43
B-11, 12, 16, 10S
R-1
SQ-41
D-3
FC, RB, SB
E-39 w/ HR-2
RAC-1
2nd Alarm Maybe:
E-53, 59, 40
L-25, 14
B-9, 14R, 33 Air Recon
E-9 w/ Sat. 1
TSU-1, RM, CTU
E-263 Communications
Car-4c
Relief at 23:55
E-10
L-3
B-4
Relocations include:
E-21 to E-58
E-24 to E-74
E-259 to E-37
L-56 to L-43
TL-21 to TL-22
TL-163 to TL-23
B-45 to B-16
B-1 to B-9
Fire on the 4th floor of a 8 story 75x85 class 2 MD
Phone Alarm Box 1323 - Reporting a fire at the construction site - 21:00
MD to B-11: Receiving a bunch of calls, some are reporting a fire at the construction site, manhole fire or a propane tank explosion - We're loading up your box & we're also giving you the Hazmat response due to the potential of a propane explosion - 21:01
B-11: We have a small electrical fire with some extension - Return all special units - Have Con Ed respond - 21:05
B-11: Using 2&2 for an electrical fire - 21:13
B-11: 1 L/S - Checking the building for CO levels - 21:35
B-11: We're still awaiting Con Ed - It seems the problem is extending into 241 & 235 we have flickering lights there - 21:55
B-11: Transmit a 10-75 - We have extension into apt. 4A at 241 West 108th St. - 22:12
L-26 FAST
B-11: Extra E&T (E-91 & TL-23) - 22:14
B-11: All Hands - 2 L/S, 1 L/O - DWH - 22:16
D-3: Based on the height of the building, Transmit a 10-77 - 22:20
E-74 HRN, E-80 CFR, B-10 Safety, E-39 w/ HR-2
D-3: Have Con Ed respond forthwith - 22:22
D-3: Transmit a 2nd Alarm - We have extension on the A line up to the 8th floor - 22:43
B-14 RUL, B-33 Air Recon, E-263 Comm. E-9 w/ Sat. 1
FC: Per D-3, We had a manhole fire with extension into Apt. 4A - Opening up all A line apartments, there's no extension - DWH - 23:03
FC: Con Ed is in the process of isolating power - 1 L/S to 241 West 108 & 1 L/S into 255 - DWH - 23:14
FC: Per C-4c, PWH - 23:39
FC: Under Control - 23:55
Duration: 2 hours & 58 min.
Maybe:
E-47, 76, 37, 58, 91 s/c, 74N, 80C
L-22, 40, 26F, 23 s/c, 43
B-11, 12, 16, 10S
R-1
SQ-41
D-3
FC, RB, SB
E-39 w/ HR-2
RAC-1
2nd Alarm Maybe:
E-53, 59, 40
L-25, 14
B-9, 14R, 33 Air Recon
E-9 w/ Sat. 1
TSU-1, RM, CTU
E-263 Communications
Car-4c
Relief at 23:55
E-10
L-3
B-4
Relocations include:
E-21 to E-58
E-24 to E-74
E-259 to E-37
L-56 to L-43
TL-21 to TL-22
TL-163 to TL-23
B-45 to B-16
B-1 to B-9
Last edited: