- Joined
- Oct 17, 2013
- Messages
- 5,974
Address: 828 7th Avenue - between West 53 & West 54 Street
Fire in a bakery on the 1st floor of a 13 story 100x170 mixed occupancy MD.
1052 - Bn. 9 - Transmit the 10-77.
TL-35 FAST
1056 - Bn. 9 - We need Con-Ed Electric. Fire originated in the electrical panel.
1058 - Bn. 9 - Primaries are negative on the 1st floor. Water on the fire.
1103 - Div. 3 - All Hands - 1 L/S/O, water on the fire. Primaries are negative in the adjoining stores. DWH
1110 - Div. 3 - MBFKD, trucks opening up. Primaries are complete and negative. DWH
1113 - Div. 3 - Secondaries are in progress. PWH - Duration 27 minutes.
1121 - Div. 3 - Under Control - Duration 34 minutes.
Maybe:
E-23, 54, 8, 40, 34 HRN, 21 CFRD
L-4, 2, 35F, 21, 16
B-9, 7, 10, 6 Safety
S-18
R-1
D-3
RB, SB, FC
E-3 w/ High Rise 1
Relocators:
E-37 act. E-54
E-4 act. E-8
L-11 act. L-2
B-11 act. B-9
Fire in a bakery on the 1st floor of a 13 story 100x170 mixed occupancy MD.
1052 - Bn. 9 - Transmit the 10-77.
TL-35 FAST
1056 - Bn. 9 - We need Con-Ed Electric. Fire originated in the electrical panel.
1058 - Bn. 9 - Primaries are negative on the 1st floor. Water on the fire.
1103 - Div. 3 - All Hands - 1 L/S/O, water on the fire. Primaries are negative in the adjoining stores. DWH
1110 - Div. 3 - MBFKD, trucks opening up. Primaries are complete and negative. DWH
1113 - Div. 3 - Secondaries are in progress. PWH - Duration 27 minutes.
1121 - Div. 3 - Under Control - Duration 34 minutes.
Maybe:
E-23, 54, 8, 40, 34 HRN, 21 CFRD
L-4, 2, 35F, 21, 16
B-9, 7, 10, 6 Safety
S-18
R-1
D-3
RB, SB, FC
E-3 w/ High Rise 1
Relocators:
E-37 act. E-54
E-4 act. E-8
L-11 act. L-2
B-11 act. B-9
Last edited: