- Joined
- Aug 5, 2015
- Messages
- 4,315
Address: 114-04 14th Ave. off 114th St.
Fire in a 2 story 50x75 PD under construction
Phone Alarm - Reporting fire in a house under construction on 14th Ave. - 00:24
E-297: 10-75 - 00:26
L-129 FAST
B-52: Extra E&T (E-274 & L-167) - 00:26
QD transmitting the All Hands.
B-52: 2 L/S, 1 L/O - DWH - 00:37
D-14: Special call 1 additional truck (L-126 act.) - 00:53
D-14: PWH - 00:59
D-14: Under Control - 01:12
Duration: 49 Min.
Maybe:
E-297, 295, 320, 273, 274 s/c
L-130, 144, 129F, 167 s/c, 126 (act.) s/c
B-52, 53
R-4
SQ-288
D-14
RAC-4
*E-273 initially unavailable
Relocations:
E-307 to E-273
L-150 to L-129
Fire in a 2 story 50x75 PD under construction
Phone Alarm - Reporting fire in a house under construction on 14th Ave. - 00:24
E-297: 10-75 - 00:26
L-129 FAST
B-52: Extra E&T (E-274 & L-167) - 00:26
QD transmitting the All Hands.
B-52: 2 L/S, 1 L/O - DWH - 00:37
D-14: Special call 1 additional truck (L-126 act.) - 00:53
D-14: PWH - 00:59
D-14: Under Control - 01:12
Duration: 49 Min.
Maybe:
E-297, 295, 320, 273, 274 s/c
L-130, 144, 129F, 167 s/c, 126 (act.) s/c
B-52, 53
R-4
SQ-288
D-14
RAC-4
*E-273 initially unavailable
Relocations:
E-307 to E-273
L-150 to L-129
Last edited: