11/22/21 Manhattan 10-77 Box 838

Joined
Jan 20, 2014
Messages
17,022
Fire Location: 145 West 47 St Hotel Riu Plaza Manhattan Times Square

Fire on the roof of a hotel under construction 49 story

B-9 transmit the 10-77

E-54,65,34,1
E-8(H.R Nozzle)
E-23(C.F.R.D)
E-3 w/ H.R 1
L-4,2,21(Fast)
L-43 Act. 24,7
L-35s/c,30 Act. 4s/c
B-9,8,7,2,6(Safety)
R-1
Sq-18
D-3
Rac-1
RB,SB
FC

B-9 All Hands

D-3 s/c 2 additional trucks

Relocations:
Engine 263 Act. Engine 8
Ladder 30 Act. Ladder 4

2460AE57-5A31-4C66-BE56-F5E6C1EDB412.jpegD9C3A635-CBEA-4C71-BB80-1012974DCFE6.jpeg23563AFE-6F32-4E70-9C66-1F614B80C328.jpeg
 
Last edited:
Joined
Feb 26, 2019
Messages
780
B9 - 1 L/S, no water on the fire yet. @1038. Duration: 16 minutes

D3 - We have water on the fire, attack staircase A. @1042. Duration: 20 minutes

D3 - All Hands. 2 L/S, 1 L/O. DWH. @1045. Duration: 23 minutes

D3 - 2 additional trucks (L30 act L4, L35)

D3 - PWH. @1107. Duration: 44 minutes

D3 - Under Control. @1118. Duration: 56 minutes

Some Relocations:
E58 act E23
E205 act E3
L15 act L7
L30 act L4
L1 act L21
B46 act B8
B13 act B9
 
Joined
Nov 1, 2016
Messages
1,401


( FDNY BOX 0838 - MANHATTAN ) - FDNY OPERATING AT A 10-77 HIGH RISE FIRE IN THE SETBACK OF A BUILDING UNDER CONSTRUCTION ON WEST 47TH STREET IN THE MIDTOWN AREA OF MANHATTAN IN NEW YORK CITY.
 
Last edited:
Top