- Joined
- Apr 13, 2012
- Messages
- 9,418
143-35 230th place
BC54: Gonna transmit a 10-75 got fire in the walls of a 2-story peaked roof PD
BC54: Using All-Hands for fire in 2nd floor walls extending to attic.
TL155 FAST
BC54: Primaries on 1st and 2nd floors are negative, they’ll be delayed in attic due to clutter. MBFKD.
BC54: Primaries throughout are negative. You can put this fire PWH. You can return R, SQ.
BC54: Secondaries negative throughout, Under Control.
Probably:
E311, E317, E302, E275
T158, L165, T155F
R4, SQ270
BC54, 51
*E314 was unavailable, on EMS run.
Relocations:
TL164/TL158
E299/E317
BC54: Gonna transmit a 10-75 got fire in the walls of a 2-story peaked roof PD
BC54: Using All-Hands for fire in 2nd floor walls extending to attic.
TL155 FAST
BC54: Primaries on 1st and 2nd floors are negative, they’ll be delayed in attic due to clutter. MBFKD.
BC54: Primaries throughout are negative. You can put this fire PWH. You can return R, SQ.
BC54: Secondaries negative throughout, Under Control.
Probably:
E311, E317, E302, E275
T158, L165, T155F
BC54, 51
*E314 was unavailable, on EMS run.
Relocations:
TL164/TL158
E299/E317
Last edited: