3 story, 20'x80' Class 3 Mixed Occupancy
Maybe,
E247, 284, 241, 282, 201 s/c
L149, 148, 109F, 114 s/c, 161 act. 149 s/c, 105 act. L105
B40, 42
S1
R5
D8
HM1, HMB, E250 HazTech unit
RAC5
B40 gave 10-75, smoke from b'ldg.
L109F
B40: we have fire behind rolled downed gate
B40: extra E/T (E201 & L114)
BklynD: on extra E/T we'll go with All Hands
B40: 2 L/S - 1/O
D8: 2 L/S/O
D8: s/c add'l Truck (L161 act. L149)
D8: we have at least 50 e-bikes that were involved, now removed to street
D8: s/c add'l Truck (L105 act. L114)
D8: extended operation due to number of e-bikes/batteries
B40: UC (duration 1 hr. 55 min.)
B40: s/c watch line E/T (E318 & L156)
L105 act. L114
L111 act. L114
L161 act. L149
L159 act. L149
E248 act. E247
E224 act. E241