2/4/23 Brooklyn 10-75 Box 1772

Joined
Jan 20, 2014
Messages
17,029
Fire Location: 719 Hendrix St

Fire in a 2 story flat roof PD

B-39 All Hands. Extra Engine & Truck

E-290,332,225,236,231s/c
L-103,175,107(Fast),120s/c
B-39,44
R-2
Sq-252
D-15
Rac-4
 
Last edited:
Joined
Jan 16, 2009
Messages
2,608
L103 gave 10-75, fire in basement of PD

B39: extra E/T for WBs

B39: fire basement & 1st floor, 2 L/S/O

B39: (1) 10-45 Code 4

D15: 3 L/S - 2 L/O

D15: UC (duration 49 min.)

E214 act. E225
L108 act. L175
L132 act. L103
E230 act. E332

L103 gave 10-75, fire in basement of PD

B39: extra E/T for WBs

B39: fire basement & 1st floor, 2 L/S/O

B39: (1) 10-45 Code 4

D15: 3 L/S - 2 L/O

D15: UC (duration 49 min.)

E214 act. E225
L108 act. L175
L132 act. L103
E230 act. E332
With it being only the 4th day of February ,
I'm amazed that the work contuines especially in E.N.Y. & Flatbush Brooklyn USA
ENGINE 332 / H & L 175. / ENGINE 248.
 
Top