Address: 299 Davis Ave. off St Austins Place
Fire on the exterior with extension in a 2½ story PD
Phone Alarm - Reporting fire in a PD - 00:07
B-22: 10-75 - Fire on the exterior in the front - 00:09
L-80 FAST
B-22: All Hands - 1 L/S/O - 00:12
D-8: 2 L/S/O checking for extension - We have a heavy clutter condition - Extra E&T (E-163 & L-81 act. 80) - 00:20
D-8: Stretching a 3rd line - 00:22
D-8: We now have fire in the attic - 00:25
D-8: We need 2 more trucks (L-109 act. 79 & L-83) - 00:28
D-8: We found fire in the ceiling on the 2nd floor - Water on the fire - Heavy clutter conditions throughout - 00:32
D-8: 5 L/S, 2 L/O - Chasing pockets of fire throughout - 00:38
D-8: Fire through the roof - Go with the 2nd Alarm - 00:39
B-40 (act. 22) FF, B-23 RUL, B-42 Safety
Fallback step 3 has been implemented in the borough
D-8: Trucks are still chasing pockets of fire - DWH - 01:05
FC: Trucks continue to open up - DWH - 01:31
FC: AVFKD - PWH - 01:49
D-8: Extended operation due to the heavy clutter condition - Assign 2 additional trucks, 1 will relieve the FAST truck (L-169 act. 79, TL-77F) - 02:12
D-8: Under Control - 03:04
Duration: 2 Hours & 58 Min.
Maybe:
E-156, 155, 157, 153, 163 s/c
L-79, 78, 80F, 81 (act. 80) s/c, 109 (act. 79) s/c, 83 s/c
B-22, 21
R-5
SQ-8
D-8
RAC-5
E-159 w/ Sat. 5
2nd Alarm Maybe:
E-243 (act. 155), 160, 152
L-169 (act. 79) s/c, 77F s/c
B-40 (act. 22), 23R, 42S
FC, RB, SB, TSU-2, RM
Car-4h
Relocations:
E-201 to E-156
E-202 to E-163
E-243 to E-155
E-211 to E-152
E-309 to E-160
E-281 to E-153
E-245 to SQ-8
L-81 to L-80
L-109 to L-79
L-169 to L-79
L-15 to L-79
L-131 to L-83
L-11 to L-77
SQ-252 to R-5
B-43 to B-23
B-40 to B-22
B-6 to B-22
B-1 to B-21
Fire on the exterior with extension in a 2½ story PD
Phone Alarm - Reporting fire in a PD - 00:07
B-22: 10-75 - Fire on the exterior in the front - 00:09
L-80 FAST
B-22: All Hands - 1 L/S/O - 00:12
D-8: 2 L/S/O checking for extension - We have a heavy clutter condition - Extra E&T (E-163 & L-81 act. 80) - 00:20
D-8: Stretching a 3rd line - 00:22
D-8: We now have fire in the attic - 00:25
D-8: We need 2 more trucks (L-109 act. 79 & L-83) - 00:28
D-8: We found fire in the ceiling on the 2nd floor - Water on the fire - Heavy clutter conditions throughout - 00:32
D-8: 5 L/S, 2 L/O - Chasing pockets of fire throughout - 00:38
D-8: Fire through the roof - Go with the 2nd Alarm - 00:39
B-40 (act. 22) FF, B-23 RUL, B-42 Safety
Fallback step 3 has been implemented in the borough
D-8: Trucks are still chasing pockets of fire - DWH - 01:05
FC: Trucks continue to open up - DWH - 01:31
FC: AVFKD - PWH - 01:49
D-8: Extended operation due to the heavy clutter condition - Assign 2 additional trucks, 1 will relieve the FAST truck (L-169 act. 79, TL-77F) - 02:12
D-8: Under Control - 03:04
Duration: 2 Hours & 58 Min.
Maybe:
E-156, 155, 157, 153, 163 s/c
L-79, 78, 80F, 81 (act. 80) s/c, 109 (act. 79) s/c, 83 s/c
B-22, 21
R-5
SQ-8
D-8
RAC-5
E-159 w/ Sat. 5
2nd Alarm Maybe:
E-243 (act. 155), 160, 152
L-169 (act. 79) s/c, 77F s/c
B-40 (act. 22), 23R, 42S
FC, RB, SB, TSU-2, RM
Car-4h
Relocations:
E-201 to E-156
E-202 to E-163
E-211 to E-152
E-309 to E-160
E-281 to E-153
E-245 to SQ-8
L-109 to L-79
L-169 to L-79
L-15 to L-79
L-131 to L-83
L-11 to L-77
SQ-252 to R-5
B-43 to B-23
B-6 to B-22
B-1 to B-21
Last edited: