- Joined
- Aug 5, 2015
- Messages
- 4,368
Address: 586 Gulf Ave. off Bloomfield Ave.
Fire on the roof of a 1 story 650x1500 class 2 warehouse
Phone Alarm - Reporting fire in a warehouse - 14:41
SI to E-158 & TL-86: We're receiving a couple of calls & also the class 3 - 14:42
Box loaded up due to calls - 14:42
E-166: Transmit the 10-75 - We have a heavy volume of smoke, we're enroute - 14:45
L-80 FAST
L-83: We are delayed in heavy traffic - 14:50
D-8: Start out an extra E&T from the other side due to the traffic (E-164 & TL-87) - 14:51
SI transmitting the All Hands.
B-22: We have fire on the solar panels on the roof - 14:53
B-22: Special call 2 additional TL's (TL-79 & TL-85) - 14:55
B-21: We're delayed in heavy traffic as well - 14:55
D-8: Assign B-23 from the other side due to the traffic - 14:56
B-22: Transmit a 2nd Alarm - 14:58
B-43 (act. 21) RUL, B-42 Safety
D-8: We have TL's setup, getting water on the fire - We're evacuating the building - DWH - 15:07
Fallback Step 2 has been implemented in the borough - 15:15
D-8: AVFKD - Working with building engineers to shut power to the solar panel system - 15:26
D-8: PWH - 15:46
D-8: Under Control - 16:04
Duration: 1 Hour & 25 Min.
Maybe:
E-158, 166, 163, 157, 164 s/c
L-86, 83, 80F, 87 s/c, 79 s/c, 85 s/c
B-22, 21, 23 s/c
R-5
SQ-8
D-8
RAC-5
E-159 w/ Sat. 5
2nd Alarm Maybe:
E-156, 168, 160
B-43R (act. 21), 42S
FC, SB, RB, TSU-2, CTU, RM
Car-23d
Relocations:
E-241 to E-163
E-243 to E-158
E-239 to E-156
E-210 to E-160
L-149 to L-86
L-169 to L-80
L-132 to L-169
L-119 to L-79
L-153 to L-85
B-40 to B-22
B-43 to B-21
B-33 to B-21
B-32 to B-23
B-37 to B-42
Fire on the roof of a 1 story 650x1500 class 2 warehouse
Phone Alarm - Reporting fire in a warehouse - 14:41
SI to E-158 & TL-86: We're receiving a couple of calls & also the class 3 - 14:42
Box loaded up due to calls - 14:42
E-166: Transmit the 10-75 - We have a heavy volume of smoke, we're enroute - 14:45
L-80 FAST
L-83: We are delayed in heavy traffic - 14:50
D-8: Start out an extra E&T from the other side due to the traffic (E-164 & TL-87) - 14:51
SI transmitting the All Hands.
B-22: We have fire on the solar panels on the roof - 14:53
B-22: Special call 2 additional TL's (TL-79 & TL-85) - 14:55
B-21: We're delayed in heavy traffic as well - 14:55
D-8: Assign B-23 from the other side due to the traffic - 14:56
B-22: Transmit a 2nd Alarm - 14:58
B-43 (act. 21) RUL, B-42 Safety
D-8: We have TL's setup, getting water on the fire - We're evacuating the building - DWH - 15:07
Fallback Step 2 has been implemented in the borough - 15:15
D-8: AVFKD - Working with building engineers to shut power to the solar panel system - 15:26
D-8: PWH - 15:46
D-8: Under Control - 16:04
Duration: 1 Hour & 25 Min.
Maybe:
E-158, 166, 163, 157, 164 s/c
L-86, 83, 80F, 87 s/c, 79 s/c, 85 s/c
B-22, 21, 23 s/c
R-5
SQ-8
D-8
RAC-5
E-159 w/ Sat. 5
2nd Alarm Maybe:
E-156, 168, 160
B-43R (act. 21), 42S
FC, SB, RB, TSU-2, CTU, RM
Car-23d
Relocations:
E-241 to E-163
E-243 to E-158
E-239 to E-156
E-210 to E-160
L-149 to L-86
L-169 to L-80
L-132 to L-169
L-119 to L-79
L-153 to L-85
B-40 to B-22
B-33 to B-21
B-32 to B-23
B-37 to B-42
Last edited: