Address: 1410 Morris Avenue - between East 170 & East 171 Street
Electrical fire in the basement of a 6 story 100x50 MD.
2158 - Bn. 17 - Give a 10-75. Fire in the electrical room in the basement.
L-49 FAST - E-50 4th Engine (became available from another run)
2201 - Bn. 17 - Extra Engine and Truck (E-46, TL-31). Power is out to the entire building. 2 L/S, 1 L/O. All Hands.
2205 - Div. 6 - We have heavy arching in the basement at the electrical panel. Put a rush on Con-Ed. Dry chem on the fire. MBFKD. Primaries are complete and negative in the basement.
2216 - Div. 6 - MBFKD. Primaries are negative up to the 3rd floor. We have (1) 10-45 code 4.
2223 - Div. 6 - Conditions remain the same. We have heavy arching and high CO. Special call an additional Truck, Battalion, and Vent Support Unit (TL-46 act. TL-44, B-19, TL-33 VSU) DWH
2240 - Div. 6 - Still have heavy arching. Keeping it at bey with Dry Chem. We're running out of Purple K. Send us 2 additional trucks (L-59, TL-45).
2246 - Div. 6 - We have (3) additional 10-45 code 4's for a total of 4.
2258 - Div. 6 - Con Ed is in the process of cutting power to the building. Units are setting up fans to vent. CO levels are coming down. DWH
2308 - Div. 6 - Send us 2 additional Trucks, one will be the new FAST Truck (L-55, L-27 FAST)
2313 - Div. 6 - Transmit the 2nd Alarm. We still have heavy arching. Con Ed has not been able to shut down the power.
2315 - Div. 6 - Have responding units bring their dry chem to the front of the building.
2331 - Div. 6 - Con Ed has cut the power. Smoke is clearing and CO is going down. Return all units who are not on scene. PWH - Duration 1 hour 40 minutes.
Maybe:
E-92, 42, 68, 50, 46 s/c
L-44, 19, 49F, 31 s/c, 46 act. 44 s/c, 59 s/c, 45 s/c, 55 s/c, 27F s/c
B-17, 26, 19 s/c
S-41
R-3
D-6
RAC-3
TL-33 Vent Support
2nd Alarm:
E-96 act. 50, 89 act. 46, 75
B-13 RUL, 14 Safety
FC, SB, RB, Tac 1
E-72 w/ Sat. 2
Relocators:
E-89 act. E-46
E-96 act. E-50
E-297 act. E-89
E-37 act. E-42
TL-46 act. TL-44
TL-117 act. TL-44
L-26 act. L-59
Electrical fire in the basement of a 6 story 100x50 MD.
2158 - Bn. 17 - Give a 10-75. Fire in the electrical room in the basement.
L-49 FAST - E-50 4th Engine (became available from another run)
2201 - Bn. 17 - Extra Engine and Truck (E-46, TL-31). Power is out to the entire building. 2 L/S, 1 L/O. All Hands.
2205 - Div. 6 - We have heavy arching in the basement at the electrical panel. Put a rush on Con-Ed. Dry chem on the fire. MBFKD. Primaries are complete and negative in the basement.
2216 - Div. 6 - MBFKD. Primaries are negative up to the 3rd floor. We have (1) 10-45 code 4.
2223 - Div. 6 - Conditions remain the same. We have heavy arching and high CO. Special call an additional Truck, Battalion, and Vent Support Unit (TL-46 act. TL-44, B-19, TL-33 VSU) DWH
2240 - Div. 6 - Still have heavy arching. Keeping it at bey with Dry Chem. We're running out of Purple K. Send us 2 additional trucks (L-59, TL-45).
2246 - Div. 6 - We have (3) additional 10-45 code 4's for a total of 4.
2258 - Div. 6 - Con Ed is in the process of cutting power to the building. Units are setting up fans to vent. CO levels are coming down. DWH
2308 - Div. 6 - Send us 2 additional Trucks, one will be the new FAST Truck (L-55, L-27 FAST)
2313 - Div. 6 - Transmit the 2nd Alarm. We still have heavy arching. Con Ed has not been able to shut down the power.
2315 - Div. 6 - Have responding units bring their dry chem to the front of the building.
2331 - Div. 6 - Con Ed has cut the power. Smoke is clearing and CO is going down. Return all units who are not on scene. PWH - Duration 1 hour 40 minutes.
Maybe:
E-92, 42, 68, 50, 46 s/c
L-44, 19, 49F, 31 s/c, 46 act. 44 s/c, 59 s/c, 45 s/c, 55 s/c, 27F s/c
B-17, 26, 19 s/c
S-41
R-3
D-6
RAC-3
TL-33 Vent Support
2nd Alarm:
E-96 act. 50, 89 act. 46, 75
B-13 RUL, 14 Safety
FC, SB, RB, Tac 1
E-72 w/ Sat. 2
Relocators:
E-96 act. E-50
E-297 act. E-89
E-37 act. E-42
TL-117 act. TL-44
Last edited: