Address: 665 5th Ave. at East 53th St.
Fire on the first floor of a 12 story 120x120 office building under construction
E-23: We have a heavy smoke condition in front - 18:04
B-8: 10-75 - Smoke on the first floor - 18:08
L-24 FAST
B-8: All Hands - 1 L/S not in operation - DWH - 18:12
D-3: Transmit the 10-76 - 18:14
E-21 CFR, E-40 Lobby, B-6 Safety, E-3 w/ HR-1
B-8: AVFKD- We still have a heavy smoke condition in the building, we are working to clear it - 18:20
D-3: We had a fire in a 55 gallon diesel drum that has been extinguished - We still have a heavy smoke condition - 18:29
D-3: PWH - 18:38
D-3: Under Control - 18:54
Duration: 53 Min.
Maybe:
E-8, 65, 23, 54, 21C, 40L
L-2, 4, 24F, 16, 35
B-8, 9, 10, 7, 6S
R-1
SQ-18
D-3
FC, RB, SB, TSU-1, MSU, RM, CTU
E-7 Communications
RAC-1
Car-23d
Relocations:
E-263 to E-54
E-219 to E-21
L-8 to L-24
L-30 to L-2
L-154 to L-4
B-1 to B-9
B-35 to B-8
Fire on the first floor of a 12 story 120x120 office building under construction
E-23: We have a heavy smoke condition in front - 18:04
B-8: 10-75 - Smoke on the first floor - 18:08
L-24 FAST
B-8: All Hands - 1 L/S not in operation - DWH - 18:12
D-3: Transmit the 10-76 - 18:14
E-21 CFR, E-40 Lobby, B-6 Safety, E-3 w/ HR-1
B-8: AVFKD- We still have a heavy smoke condition in the building, we are working to clear it - 18:20
D-3: We had a fire in a 55 gallon diesel drum that has been extinguished - We still have a heavy smoke condition - 18:29
D-3: PWH - 18:38
D-3: Under Control - 18:54
Duration: 53 Min.
Maybe:
E-8, 65, 23, 54, 21C, 40L
L-2, 4, 24F, 16, 35
B-8, 9, 10, 7, 6S
R-1
SQ-18
D-3
FC, RB, SB, TSU-1, MSU, RM, CTU
E-7 Communications
RAC-1
Car-23d
Relocations:
E-263 to E-54
E-219 to E-21
L-8 to L-24
L-30 to L-2
L-154 to L-4
B-1 to B-9
B-35 to B-8