Address: 1370 5th Avenue - between 112 & 115 Street
Fire on the 12th floor of a 14 story 100x150 MD.
1102 - L-26 - Transmit the 10-77. We have heavy smoke coming out of 12E.
TL-14 FAST
1106 - Bn. 12 - Transmit the 10-70. We have a dry standpipe, we're going to need help with this stretch. Give me an additional Engine and Truck (E-76, L-30).
1111 - Bn. 12 - We have water on the fire. We're going to need Con Ed to shut down the gas to the stove.
1120 - Div. 3 - All Hands - Fire on the 12th floor. 1 L/S/O, primary on the fire floor and floor above are complete and negative. Trucks are opening up.
1125 - Div. 3 - Secondaries are complete and negative on the fire floor and in the public hallways. PWH - Duration 28 minutes.
Maybe:
E-58, 91, 53, 35, 47 HRN, 37 CFRD, 76 s/c
L-26, 43, 14F, 40, 22, 30 s/c
B-12, 11, 10, 14 Safety
S-41
R-1
D-3
RB, SB, FC, RAC-3
TL-17 Vent Support
Fire on the 12th floor of a 14 story 100x150 MD.
1102 - L-26 - Transmit the 10-77. We have heavy smoke coming out of 12E.
TL-14 FAST
1106 - Bn. 12 - Transmit the 10-70. We have a dry standpipe, we're going to need help with this stretch. Give me an additional Engine and Truck (E-76, L-30).
1111 - Bn. 12 - We have water on the fire. We're going to need Con Ed to shut down the gas to the stove.
1120 - Div. 3 - All Hands - Fire on the 12th floor. 1 L/S/O, primary on the fire floor and floor above are complete and negative. Trucks are opening up.
1125 - Div. 3 - Secondaries are complete and negative on the fire floor and in the public hallways. PWH - Duration 28 minutes.
Maybe:
E-58, 91, 53, 35, 47 HRN, 37 CFRD, 76 s/c
L-26, 43, 14F, 40, 22, 30 s/c
B-12, 11, 10, 14 Safety
S-41
R-1
D-3
RB, SB, FC, RAC-3
TL-17 Vent Support