- Joined
- Aug 5, 2015
- Messages
- 4,322
Address: 208 Bement Ave. off Henderson Ave.
Fire throughout a 2½ story 25x50 PD
Phone Alarm - Reporting a dwelling at Henderson Ave. & Bement Ave. - 22:44
B-22: Any additional info? - SI to B-22: We're getting numerous calls for the intersection - Due to the quantity & quality of the calls, we're loading up the box - 22:45
L-78 FAST
B-22: Extra E&T (E-153 & L-83) - 22:46
SI transmitting the All Hands.
B-22: Transmit the 2nd Alarm - 22:48
B-42 RUL, B-40 Safety
Fallbrook step 2 implemented in the borough
B-22: Tentative Address is 208 Bement Ave. - 1 L/S/O from the exterior - 22:51
B-22: We have a partial collapse of the front porch with downed power lines - 22:52
D-8: Fire on all 3 floors - Special call a TL (TL-86) - 22:56
D-8: 3 L/S/O - DWH - 23:00
D-8: 4 L/S/O - MBFKD in the basement & first floor, making progress in the attic - DWH - 23:12
D-8: Special call 2 additional trucks (L-84 act. 79 & L-148 act. 77) - 23:18
D-8: We have slight extension to the exterior of exposure 2 - Requesting an extra engine & 2 additional trucks (E-167 act. 156, L-166 act. 80 & L-81) - 23:30
FC: Per D-8, PWH - 23:53
FC: Under Control (mixer off message) - 00:17
Duration: 1 Hour & 33 Min.
D-8: Special call 1&1 for relief (E-168 & L-82) - 00:59
D-8: Also requesting a TL for relief (TL-159 act. 79) - 01:01
Maybe:
E-156, 157, 155, 163, 153 s/c
L-79, 80, 78, 83 s/c
B-22, 21
R-5
SQ-8
D-8
RAC-5
E-159 w/ Sat. 5
2nd Alarm Maybe:
E-160, 158, 152, 167 (act. 156) s/c
L-77, 86 s/c, 84 (act. 79) s/c, 148 (act. 77) s/c, 166 (act. 80) s/c, 81 s/c
B-23, 42R, 40S
FC, SB, RB, TSU-2, CTU, RM
Relief at 01:00
E-168
L-82, 159 (act. 79)
Watchline at 02:00
E-5
L-76
B-39
Relocations:
E-167 to E-156
E-253 to E-153
E-240 to E-163
E-201 to E-160
L-11 to L-78
L-148 to L-77
L-105 to L-77
L-84 to L-79
L-159 to L-79
L-166 to L-80
L-15 to L-86
B-33 to B-21
B-31 to B-22
Fire throughout a 2½ story 25x50 PD
Phone Alarm - Reporting a dwelling at Henderson Ave. & Bement Ave. - 22:44
B-22: Any additional info? - SI to B-22: We're getting numerous calls for the intersection - Due to the quantity & quality of the calls, we're loading up the box - 22:45
L-78 FAST
B-22: Extra E&T (E-153 & L-83) - 22:46
SI transmitting the All Hands.
B-22: Transmit the 2nd Alarm - 22:48
B-42 RUL, B-40 Safety
Fallbrook step 2 implemented in the borough
B-22: Tentative Address is 208 Bement Ave. - 1 L/S/O from the exterior - 22:51
B-22: We have a partial collapse of the front porch with downed power lines - 22:52
D-8: Fire on all 3 floors - Special call a TL (TL-86) - 22:56
D-8: 3 L/S/O - DWH - 23:00
D-8: 4 L/S/O - MBFKD in the basement & first floor, making progress in the attic - DWH - 23:12
D-8: Special call 2 additional trucks (L-84 act. 79 & L-148 act. 77) - 23:18
D-8: We have slight extension to the exterior of exposure 2 - Requesting an extra engine & 2 additional trucks (E-167 act. 156, L-166 act. 80 & L-81) - 23:30
FC: Per D-8, PWH - 23:53
FC: Under Control (mixer off message) - 00:17
Duration: 1 Hour & 33 Min.
D-8: Special call 1&1 for relief (E-168 & L-82) - 00:59
D-8: Also requesting a TL for relief (TL-159 act. 79) - 01:01
Maybe:
E-156, 157, 155, 163, 153 s/c
L-79, 80, 78, 83 s/c
B-22, 21
R-5
SQ-8
D-8
RAC-5
E-159 w/ Sat. 5
2nd Alarm Maybe:
E-160, 158, 152, 167 (act. 156) s/c
L-77, 86 s/c, 84 (act. 79) s/c, 148 (act. 77) s/c, 166 (act. 80) s/c, 81 s/c
B-23, 42R, 40S
FC, SB, RB, TSU-2, CTU, RM
Relief at 01:00
E-168
L-82, 159 (act. 79)
Watchline at 02:00
E-5
L-76
B-39
Relocations:
E-253 to E-153
E-240 to E-163
E-201 to E-160
L-11 to L-78
L-105 to L-77
L-159 to L-79
L-166 to L-80
L-15 to L-86
B-33 to B-21
B-31 to B-22
Last edited: