- Joined
- Aug 5, 2015
- Messages
- 4,261
Address: 56 Pine St. at Ridgewood Ave.
Fire on the first floor laundromat in a 3 story 20x60 mixed occupancy
Phone Alarm - Reporting a fire on the 3rd floor at 56 Pine St. - 11:55
BD to B-39: Also receiving the laundromat at 409 Ridgewood - 11:56
E-236: We're passing that box, looks like the laundromat, we'll get back to you - 11:59
E-236: Transmit the 10-75 - 11:59
TL-135 FAST
B-39: All Hands (E-286 & L-176) - Fire on the first floor - 2 L/S, 1 L/O - 12:07
B-39: Extra E&T (E-214 act. 332 & L-103) - 12:09
D-15: 2 L/S, 1 precautionary line stretched to the roof, DWH - 12:29
D-15: 3 L/S/O, DWH - 12:38
D-15: Under Control - 13:16
Duration: 1 Hour & 22 Min.
Maybe:
E-236, 332, 293, 225, 286, 214 (act. 332) s/c
L-175, 107, 135F, 176, 103 s/c
B-39, 44
R-2
SQ-252
D-15
RAC-4
Relocations:
E-214 to E-332
E-218 to E-236
L-153 to L-107
L-113 to L-103
Fire on the first floor laundromat in a 3 story 20x60 mixed occupancy
Phone Alarm - Reporting a fire on the 3rd floor at 56 Pine St. - 11:55
BD to B-39: Also receiving the laundromat at 409 Ridgewood - 11:56
E-236: We're passing that box, looks like the laundromat, we'll get back to you - 11:59
E-236: Transmit the 10-75 - 11:59
TL-135 FAST
B-39: All Hands (E-286 & L-176) - Fire on the first floor - 2 L/S, 1 L/O - 12:07
B-39: Extra E&T (E-214 act. 332 & L-103) - 12:09
D-15: 2 L/S, 1 precautionary line stretched to the roof, DWH - 12:29
D-15: 3 L/S/O, DWH - 12:38
D-15: Under Control - 13:16
Duration: 1 Hour & 22 Min.
Maybe:
E-236, 332, 293, 225, 286, 214 (act. 332) s/c
L-175, 107, 135F, 176, 103 s/c
B-39, 44
R-2
SQ-252
D-15
RAC-4
Relocations:
E-218 to E-236
L-153 to L-107
L-113 to L-103
Last edited: