1/2/18 Manhattan 2nd Alarm Box 1188

Joined
Jan 20, 2014
Messages
20,979
Fire Location: 1720 2nd Ave

Fire in the duct work 1st fl to roof of a 5 story MD

E-5 Act.22,53,44,35
L-13,43,22(Fast)
B-12,8
R-1
Sq-41
D-3
Rac-4

D-3 2nd Alarm @11:00

2nd Alarm
E-76,74,8,23
E-9 w/ Sat. 1
L-14,16
B-9(FF)
B-45(Safety)
B-14(RUL)
RB,SB
FC,FCB
Tac-1
CTU
TA-76

D-3 s/c 2 additional trucks @11:13

*Fallback Step 3*
 
This is on my street, would have been there in less than a minute

Battalion 12 Gave the All-Hands on Arrival

Div 3 Transmit a 2nd Alarm Fire on 2nd floor

Rundown would be:
E-5 act 22,53,91,44
L-13,43,22F
B-12,8

Div. 3- S/C 2 addtl Trucks above the 2nd @ 11:13
Fallback Step 3 @11:13

As per twitter, Engine 5 took this in 1st due

Under control @ 12:10
 
Back
Top